<!-- https://zerolog.ch/news/preview-tunnel-survive-updates-2026-11-04 -->
# 4 November: updates no longer end app previews, and the tunnel service updates without dropping connections

2026-11-04 · Product

> A live preview of an app in your container, the one-click drive, SSH and ZeroLog Link stay connected during an update.

Two kinds of live connections used to break when we updated ZeroLog. They now stay up.

*Live connections and what an update does to them.*

## What carries on

The live preview of an app that runs in your container no longer ends during an update. The same holds for the one-click drive, SSH and ZeroLog Link connections. The tunnel service behind them now updates without dropping connections.

## Who notices

Anyone who watches a preview or has a drive, SSH or ZeroLog Link connected while we update. No action is needed.
